JEE Main · 2007 · 29 Apr 2007 · Offline · Work, Power & Energy

WhatsApp Email
A 2 kg block slides on a horizontal floor with a speed of . It strikes a uncompressed spring, and compresses it till the block is motionless. The kinetic friction force is 15 N and spring constant is . The spring compresses by
  1. (A)5.5 cm✓ Correct
  2. (B)2.5 cm
  3. (C)11.0 cm
  4. (D)8.5 cm

Answer: (A)

Solution

Use energy conservation from the moment of contact until the block stops: the initial kinetic energy goes partly into the spring and partly into work done against friction, so . Putting J, N/m and N gives . The positive root is about m, so the spring is compressed by roughly cm.

JEE Main · 2007 · 29 Apr 2007 · Offline · Single correct option

More JEE Main questions on Work, Power & Energy

  1. Given below are two statements:
    Statement I: An object moves from position to position under a conservative force field . The work done by the force is .
    Statement II: Any object moving from one l …
    JEE Main 2026View solution →
  2. Consider two identical metallic spheres of radius each having charge and mass . Their centers have an initial separation of . Both the spheres are given an initial speed of towards each other. The minimum value of , so that they can just touch e …
    JEE Main 2026View solution →
  3. A body of mass 2 kg is moving along x-direction such that its displacement as function of time is given by , where , an …
    JEE Main 2026View solution →
  4. In case of vertical circular motion of a particle by a thread of length r if the tension in the thread is zero at an angle 30° shown in figure, the velocity at the bottom point (A) of the circular path is (g = gravitational acceleration)
    JEE Main 2026View solution →
  5. A spherical ball of mass 2 kg falls from a height of 10 m and is brought to rest after penetrating 10 cm into sand. The average force exerted by sand on the ball is N.
    JEE Main 2026View solution →
  6. A 1 kg block subjected to two simultaneous forces N and N is moved a distance of 25 m along direction. The work done in this process is _____ J.
    JEE Main 2026View solution →