CBSE Class 12 · 2003 · Delhi Compartment · SolutionsShort Answer

WhatsApp Email
An aqueous solution of sodium chloride freezes below 273 K. Explain the lowering in freezing point of water with the help of a suitable diagram.

Solution

A substance freezes when the vapour pressure of its liquid equals that of its solid.
Dissolved NaCl lowers the vapour pressure of water, so the solution's vapour-pressure curve lies below that of pure water.
The curve of ice is unchanged; the solution's curve now intersects the ice curve at a temperature lower than 273 K.
Hence the solution freezes below 273 K, the depression being (see figure).
Structure Vapour pressure vs temperature: the solution's curve cuts the ice curve below 273 K (depression of freezing point)
Vapour pressure vs temperature: the solution's curve cuts the ice curve below 273 K (depression of freezing point)

CBSE Class 12 Board · 2003 · Delhi Compartment · Subjective

More board questions on Solutions

  1. Isotonic solutions have the same
    CBSE 2024View solution →
  2. Van't Hoff factor for NaSO10HO solution, assuming complete ionization, is
    CBSE 2024View solution →
  3. (a)(i) Ishan's automobile radiator is filled with 1.0 kg of water. How many grams of ethylene glycol (molar mass = 62 g mol) must Ishan add to get the freezing point of the solution lowered to −2.8°C? (K for water = 1.86 K kg mol)
    (ii) What type of deviation fro …
    CBSE 2024View solution →
  4. (b)(i) The boiling point of water at 750 mm Hg pressure is 99.68°C. How much sucrose (molar mass = 342 g mol) is to be added to 500 g of water so that it boils at 100°C? (K for water = 0.52 K kg mol)
    (ii) State Henry's law and write any one application of it.
    CBSE 2024View solution →
  5. Which of the following aqueous solutions will have the highest boiling point?
    CBSE 2023View solution →
  6. (i) Why is the boiling point of 1 M NaCl solution more than that of 1 M glucose solution?
    (ii) A non-volatile solute 'X' (molar mass = 50 g mol), when dissolved in 78 g of benzene, reduced its vapour pressure to 90%. Calculate the mass of X dissolved in the solution.
    (iii) …
    CBSE 2023View solution →